What it is
Open any PDF, image or DWG/DXF drawing full screen. Set the scale once, then measure lengths, areas and perimeters (tap a room). Mark it up with pens, arrows, shapes and text. Drop a pin to create a real record right there: site issue, task, RFI, NCR, safety incident, photo, work item (BOQ) or cost (change order). Check where two sets of layers clash (for example plumbing against walls), and turn a CAD plan into a 3D model of the building.
Why you'll love it
- Issues have an exact location - no more “the crack near the stairs somewhere”.
- Each pin shows the live status of its record.
- Revisions, PDF export with or without your markup.
- Measure a room by tapping inside it - area and perimeter in one click.
▶ Watch it
How to do it
Tick each step as you try it in Metrak.
How it connects
Records you create here flow into - or come from - these features.
Schedule: milestones & tasks
Task pins create tasks.RFIs & submittals
RFI pins create RFIs at the exact spot.Quality & safety
NCR and safety pins create quality and safety records.Change orders & retention
Cost pins create change orders.BOQ & budget
Work-item pins link to BOQ lines; AI can extract BOQ lines from a drawing.3D building view
Any DWG/DXF plan opens as a 3D building in one click.More in Projects & planning
Ready to run your projects on Metrak?
Start free - no credit card. Your whole team can be on it today.
