Construction software that works the way sites talk
Speak the daily report, log expenses as you pay them, open AutoCAD drawings on the phone, let documents file themselves - and let Ask Metrak turn one sentence into every record it needs.
The daily site report you speak instead of type
Say your day on site and Metrak writes the daily progress report: workers per trade, equipment, materials, weather, work done and issues. Free, in Arabic and English.
Track every site expense the moment you pay it
Track construction site expenses by speaking: "450 for steel transport and 200 daily wages" becomes two categorized expenses on the right project. Free.
Open AutoCAD drawings anywhere - and get a BOQ from them
Open DWG, DXF and PDF drawings in the browser or on the phone, mark up site issues, see it in 3D, and let AI draft a BOQ from an AutoCAD drawing.
Project documents that file themselves
Upload contracts, BOQs, drawings, invoices, permits and site photos - Metrak files each by type automatically, so every document is one filter away.
One sentence from site. Every record it needs.
Say what happened on site and Ask Metrak creates every record it describes: expenses, daily report, tasks, RFIs, NCRs, safety - editable before saving.
